
The building, developer footage
Informations clés
- Statut
- En construction
- Mode de détention
- leasehold
- Bail, années
- 30
- Types de lots
- studio, 1BR, duplex, penthouse
- Livraison
- Q1 2027
Visite vidéo
Description
An apart-hotel development on the Seseh–Cemagi coast, west of Pererenan, with management stated to be by a hotel operator. Unlike most projects on this market, the developer publishes genuine construction footage — that is what the gallery above is made of.
Tenure and payment
Per the developer’s materials: a 30-year leasehold running through 2056, with a payment structure of 50% down and the balance on completion. That means a large share of the money is committed before handover, so it is critical for the buyer that payments track verified construction milestones rather than the calendar alone.
What you should know plainly
The project has a public history of delay: handover moved from 2025 to Q1 2027, with reports that construction was paused to obtain the PBG building permit. We treat that as material, not a detail — which is why on this project we specifically verify the current permit package and insist on late-delivery penalties in the contract.
About the price
The figure shown is a reference from public listings of this project, not an offer: the actual price depends on the block, floor, size and view. We send the current price list with floor plans on request the same day, together with the project’s document package (land certificate, zoning, valid PBG permit) — so you decide on paperwork, not on renderings.







